Dispatch 417-859-2334 Accounting 417-859-5510

4006 State Hwy OO, Marshfield, MO

Southwest Missouri’s standard for concrete.

Rost has supplied the Ozarks since 1974. Four plants and a modern fleet behind every order, so the pour starts on time and keeps going until it’s finished.

A Rost Ready Mix mixer truck with 50th anniversary drum graphics at the Marshfield plant

The benchmark others measure against.

When the region’s biggest pours go out to bid, Rost is the supplier contractors plan around.

  • Capacity for Any Pour

    Backup supply across our plants keeps big pours moving.

  • In-House Fleet Shop

    Mechanics on staff keep mixers on the road and on schedule.

  • Mixes Built for the Ozarks

    Proven through freeze-thaw winters and hot summers.

  • Pumping Under One Roof

    ACPA-certified Rost Concrete Pumping reaches where the chute can’t.

What We Supply

Commercial and Structural
Engineered mixes to project spec.
Residential Flatwork
Driveways, patios, sidewalks, and floors.
Agricultural
Shop floors, feed pads, and bunker walls.
Footings and Foundations
Walls, piers, and grade beams.
Flowable Fill
Backfill for trenches, voids, and utility cuts.
Fiber and Specialty
Fiber, high-early, and winter mixes.

Close to your next pour.

Plants from Marshfield to Monett mean shorter hauls, fresher concrete, and backup supply when a job runs big.

Map of Rost Ready Mix and Kay Concrete Materials locations Rost Ready Mix plants in Marshfield, Springfield, Rogersville, and Chesapeake; Kay Concrete Materials locations in Monett, Aurora, and Mt Vernon; shown with Interstate 44, US 60, US 65, and Routes 39, 125, and 174. I-44 US-60 US-65 125 174 39 Chesapeake Springfield Rogersville Marshfield Monett Aurora Mt Vernon
Rost Ready Mix Kay Concrete Materials Drawn to scale as a general guide. Use Directions for turn-by-turn navigation.

Kay Concrete Materials

417-235-3628 kayconcrete.com

Concrete Calculators

Figure yardage for each part of the job, then use Add to Project to total them into one order.

Covers uneven subgrade, spillage, and form deflection.

Order This Much

0.00 cu yd

Exact volume
0.00 cu yd
With waste
0.00 cu yd
Truckloads
0
80-lb bag equivalent
0

Enter your dimensions to see yardage.

What Dispatch Will Ask For

  1. Job site address Plus directions or gate access notes.
  2. Yardage and mix PSI or project spec, plus any fiber, color, or accelerator.
  3. Placement method Chute, pump, or buggy. We can book Rost Concrete Pumping.
  4. Start time and spacing So loads arrive at the pace your crew finishes.

Calculator results are estimates for planning. Orders under a full load may carry a short-load charge; dispatch will confirm when you order.

The Rost logo painted on a Rost Ready Mix truck door

Build your career with the region’s leader.

CDL mixer drivers, plant operators, mechanics, and office staff at four plants across Southwest Missouri. See what’s open and how to apply.

Talk to Rost.

Dispatch handles orders, quotes, and scheduling. Accounting handles billing, credit, and tax.

Headquarters and Plant
4006 State Highway OO
Marshfield, MO 65706 · Get directions
Email
accounting@rostinc.com
Concrete Pumping
rostconcretepumping.com